In 1991 we provided the Waste Water Authority with a telecontrol system for testing purposes. The intention was to use it to transmit information and measured values via a 2-wire-line. Because regular checks of the rainwater basins, pump stations and local waste water plants were taking up more and more time, it was decided gradually to set up a telecontrol system. The test went smoothly, so the customer bought the system.
Since then, the Nagold waste water plant has run a telecontrol and process control system supplied by us, which has been updated several times. Approximately 40 remote terminal units ensure that the process operations of the outdoor structures and the biological stages of the Nagold and Haiterbach waste water plants function perfectly. In 2010, 17 substations were converted to GPRS technology, a clear vote for forward-looking transmission technologies.
With the ProCoS process control system, the customer has clear process visualisation in the form of images, protocols and hydrographs, as well as remote alerts to mobile phones and remote access from a standby laptop.
With these continuous investments, the Waste Water Authority laid the foundation stone for economical and safe operation of its plants early on. The Nagold waste water plant is currently designed for 55,000 inhabitants.

We were there from the start, and expansion will continue in the next few years.

Images

Customer

Abwasserzweckverband Nagold

Location

72202 Nagold

Year

From 1991 to the present

Products

SAE 2000-D4, FW-10, FWR-40, FW-50, ProCoS

Protocols

IEC 60870-5-104, 3964R-RK 512, Profibus-DP